PROJECT DESCRIPTION

During the February 2022 flood event, the greater Brisbane area
experienced an unprecedented 680mm of rainfall, resulting in 2.2 million megaliters flowing into Wivenhoe Dam. This impacted several Seqwater assets, including the Somerset Dam Township Water Treatment Plant (WTP), Somerset Dam Raw Water Pump Station (RWPS), and Treated Water Reservoir (TWR), accessible via a series of unsealed gravel roads off Esk Kilcoy Road.

The excessive rainfall, combined with steep gradients and poor structural integrity of the road materials, led to numerous pavement and drainage failures. Additionally, issues with a hair-pin turn near the site entrance exacerbated safety concerns, making the left turn onto Esk Kilcoy Road unsafe.

The project’s objective was to address Seqwater Enterprise Risks (ER), focusing on Workplace Health and Safety due to unsafe road conditions and water security concerns regarding potential obstacles for chemical delivery trucks accessing the WTP.

JC CIVIL PROJECTS ROLE


JC Civil Projects was engaged during the project’s feasibility phase to prepare an independent cost estimate to support Seqwater in obtaining capital funding through the Sustaining Capital Planning Investigations (SCPI) program.

Picture1.png

KEY DELIVERABLES

JC Civil Projects played a important role in the feasibility phase of the project, which included:

  • Identified precise cost estimate information

  • Offered three potential areas for cost and program savings to the client

  • Identified and optimised the proposed construction methodology for the project

  • Recommended enhanced geotechnical testing to advance the project’s design

  • Identified potential site issues to the client, collaborating with the designer to revise designs as needed.

KEY PROJECT HIGHLIGHTS

The project highlights included:

  • Refurbishment of approximately 600m of unsealed gravel access road and associated drainage leading to the Somerset Dam Township WTP, Somerset Dam RWPS, and the TWR.

  • The project was successfully delivered in compliance with Department of Transport and Main Roads (DTMR) and Austroads standards.
     

OUTCOMES AND ACHIEVEMENTS

JC Civil Projects provided a project cost summary based on first principles estimating and industry best practices, ensuring an accuracy range of +/- 130%. This estimate included a thorough risk analysis and contingency planning.

JC Civil Mono Wetsuit.png
QMS NEW RGB - JEPG.jpg
JAS ANZ - JPEG.jpg

ABN: 83393842356 | ACN: 607805998

CONTACT US

Reach out as we want to hear how we can transform your next vision into value

Thanks for submitting!

ADDRESS

QLD

2/10 Aerodrome Rd, Maroochydore, QLD 4558

WA

PO Box 508,
Perth WA 6849

NSW

PO Box Q1101, Queen Victoria Building

NSW 1230

PHONE

QLD

07 3017 4610

WA

08 9427 2800

EMAIL

  • LinkedIn
bottom of page